Short Lead Time for Metal Parts - Custom Automation Solutions – Dongtai Fortune

Short Description:


Product Detail

Product Tags

Related Video

Feedback (2)

Adhering to your principle of "quality, assistance, performance and growth", we have now gained trusts and praises from domestic and international customer for Mig Welding , Laser Cutting Service , Stamping , Good quality and competitive prices make our products enjoy a high reputation all over the word.
Short Lead Time for Metal Parts - Custom Automation Solutions – Dongtai Fortune Detail:

We create custom integrated automation solutions for low-volume and high-volume manufacturing. As an approved Fanuc supplier, our certified automation engineers can create a sophisticated automated program capable of handling all of your manufacturing needs. Our enclousures are built with high-grade aluminum and ultra-clear acrylic, surrounded by a never-slip metal platform, making them among the safest and efficient work environments available.

Each automation system that we build is capable of housing all the components needed for manufacturing, such as: robotics, fixtures, nests, electrical panels, error-proofing, video surveillance, LED lighting and more. And as with every Inovatech automation system that we build, expansion is always planned for. As your needs grow, your system can easily be modified or expanded to effectuate a seamless manufacturing pipeline.

Our Technologies
Our staff has extensive experience with custom automation
systems solutions and practical knowledge of the latest technologies available.
The automation development process includes:

Design
•System Layout Concept
•Quoting
•Cost and pricing
•Mechanical Design
•Electrical Design
•Bill of Materials
•PLC Programing
•Present final designs for approval to begin build.

Automation Build
•Order parts and begin fabrication process.
•Construct enclosure and platform.
•Install robotics, end-of-arm, fixtures and panels.
•Wire electrical panel and program robots.

Systems
•Rotary dial
•Pallet transfer
•In-line
•Robotics

Technologies
•Vision Systems
•Laser Measurements
•LVDT/LDT
•Servo, Stepper & Linear Motors
•Torque Transducers & Amplifiers
•Touch Screen Displays
•Operator Interfaces
• Data Collection
• PC & PLC Control Systems
• Systems Integration & Interfacing
• Training
• Service

Processes
•Assembly
•Inspection
•Packaging
•Orbital Forming
•Impact Forming
•Ultrasonic Welding
•Resistance Welding
•Staking
•Hot Stamping
•Impact Stamping
•Screw Driving
•Pressure Testing
•Leak Testing
•Electrical Hi Pot Testing
•Soldering
DELIVERY
•Teardown and on-site setup of equipment.
•Calibrate robotics and components.
•Validation and operator training.

Markets Served
•Automotive
•Recreational Vehicles
•Consumer Products
•Industrial
•Medical and Pharmaceutical
•HMI Programming
•Machining & Fabrication
•System Build & Installation
•Technical Manuals

custom-automation-solutions

 


Product detail pictures:

Short Lead Time for Metal Parts - Custom Automation Solutions  – Dongtai Fortune detail pictures


Related Product Guide:

We not only will try our greatest to offer you excellent services to just about every client, but also are ready to receive any suggestion offered by our buyers for Short Lead Time for Metal Parts - Custom Automation Solutions – Dongtai Fortune , The product will supply to all over the world, such as: Mexico, Saudi Arabia, Italy, Merchandise have been exported to Asia, Mid-east,European and Germany market. Our company has constantly been able to update the items performance and safety to meet the markets and strive to be top A on stable quality and sincere service. If you have the honor to do business with our company. we'll undoubtedly do our very best to support your business in China.
  • A nice supplier in this industry, after a detail and careful discussion, we reached a consensus agreement. Hope that we cooperate smoothly.
    5 Stars By Frank from Boston - 2018.06.18 17:25
    This manufacturers not only respected our choice and requirements, but also gave us a lot of good suggestions, ultimately, we successfully completed the procurement tasks.
    5 Stars By Afra from Jersey - 2017.10.25 15:53
    Write your message here and send it to us